Even if Bohol Electric Cooperative I (BOHECO-1) can finish fixing its last served lateral lines as planned on April 15, and even if the National Grid Corporation of the Philippines (NGCP) can restore the ruined power lines that transmit geothermal power from Leyte, some 28,395 households might still not get their active power connections.